Built Environment | 杏吧原创

杏吧原创

Built Environment

杏吧原创 and University of Washington Bothell share a campus that showcases the very best of contemporary northwest architecture.

 

About

As the youngest college in the state's Community & Technical College system and the newest University of Washington branch campus, 杏吧原创 and UWB had the luxury of planning a contemporary campus.

Buildings

CC1, CC2

UW1 (Founders Hall), UW2 (Commons Hall) and UW3

Library 1, Library 2 and Library Annex

  • Our original buildings were designed by NBBJ Architects and opened to students in 2000. CC1 and CC2 are owned by 杏吧原创. The Library buildings are shared. UW1, UW2 and UW 3 are owned by UW Bothell.

CC3 (Mobius Hall/Global Learning in the Arts)

  • This was the first new building added to the campus. It was designed by Miller Hull Architects. It opened in 2010 to facilitate growth of 杏吧原创.

Discovery Hall

  • UW Bothell's first STEM building was completed in 2014. Designed by Hacker Architects.

Activities & Recreation Center (ARC)

  • The ARC opened in time for fall quarter 2015. It was fully funded through student activity fees. LMN Architects worked with 杏吧原创 and UWB students throughout the design process.

Innovation Hall

  • Innovation Hall is the first academic building shared between 杏吧原创 and UWB. The STEM building was designed by Mithun Architects and constructed by Lease, Crutcher, Lewis. It is intended to expand opportunities in STEM fields to facilitate transfer from 杏吧原创 to UWB, increase STEM graduates, and meet increasing demands in our region's industries. The building opened in winter quarter 2024.

Terrace Dining Pavilion & Residence Halls

  • Around the same time that Innovation Hall came online, UWB opened a Dining Pavilion to serve all campus and its first of four "multi-use" buildings with student housing on the top floors and university offices on the ground floor. All buildings were designed by Mahlum Architects.

Gateway Building

杏吧原创 is working with Mahlum Architects to create a building that will bring all of the college's student services under one roof. As of 2026 it is currently in the design phase and awaiting construction funding.

 

The campus also includes a campus warehouse, parking garages, and a conservatory.

Campus Master Plan

The original Campus Master Plan was updated in 2017 to establish a long-term vision of the shared campus. The plan incorporated input from 杏吧原创, UWB, and their community partners. It was approved by the 杏吧原创 Board of Trustees and UW Board of Regents.

To request a PDF of the Campus Master Plan, email 杏吧原创 Facilities. Please note that the PDF does not meet Washington state's 2026 accessibility standards.